Chinese    Site Map  
 
 
 
  News > News
   
  News

  Updates
 CRBBG Undertakes Fabri..
 Chongqing East Sichuan..
 Liuzhou Guantang Bridg..
 CRTE's Turnouts of 120..
 The First Set of Singl..
 CRBBG Railway Turnouts..
 CRBBG Passes The Reeva..
 CRBBG Participated Wuh..

   
News  

Ex-Factory Acceptance of First Set of Five-Throw Switch for Extension Lines of Chongqing No.2 and No.3 Tramways
Published:2011-06-15 08:09:37    From:Corporate Culture Dept    Click:3890


 

On June 12, 2011, leaded by Tian Xiaolong, Deputy Chief Engineer of Chongqing Track Transportation Group Co., Ltd, the experts arrived at CRBBG to perform the ex-factory acceptance to the first set of five-throw switch for the extensions of No.2 and No.3 tramway lines.

The inspection team carefully checked the manufacturing quality and working condition of this equipment at the adjusting site, listened to the “First Set Manufacturing Report” and “First Set Acceptance Report”, and reviewed relevant ex-factory documents of the product.

The attendees considered that CRBBG optimized the switch design and enhanced the manufacturing process according to design liaison requirements, and agreed that the proper optimization plan and advanced process quite improved the switch quality. With smooth running, good appearance of welds and low noise, this switch realizes great breakthrough in function and completely meet the contract requirements, thus it is agreed to leave the factory.




CHINA RAILWAY BAOJI BRIDGE GROUP CO., LTD Tel:86-917-3351818 3351188 Fax:86-917-3353371
Address:80 Qingjiang Road, Baoji, Shaanxi 721006, China E-mail:baoqiao@crbbi.com
Website Maintenance:Baoji City SiKai Network technology Co., Ltd